TT27-31 At the BERMUDA BASE, the TRUMPET PULSES were then COMBINED into ONE, ACCELERATED via the stored AMPLIFICATION PULSE and DIRECTED from the BERMUDA BASE through the MONTAUK-PHI-EX PORT INTERFACE NETWORK and into the SUBTERRANEAN WTC NYC PHOENIX SPIKE LOCATION.


 

TT27-31

At the BERMUDA BASE, 

the TRUMPET PULSES were then COMBINED into ONE, 

ACCELERATED via the stored AMPLIFICATION PULSE and DIRECTED from the BERMUDA BASE 

through the MONTAUK-PHI-EX PORT INTERFACE NETWORK 

and into the SUBTERRANEAN 

WTC NYC PHOENIX SPIKE LOCATION.

https://www.reddit.com/r/CourtofAges/comments/1bo8p2y/tt2731_at_the_bermuda_base_the_trumpet_pulses/?utm_source=share&utm_medium=web3x&utm_name=web3xcss&utm_term=1&utm_content=share_button


Comments

Popular posts from this blog

TT30-31 Other PRIMARY PHOENIX SPIKE SITES on the UIR “FIRST WAVE” ACTIVATION list include ATLANTA-GA, Las Vegas-NV, Spokane-WA, St. Louis-MO), Denver/Boulder-CO, Miami-FL, London-England, Iraq, and Palestine. THERE ARE “THREE WAVES” of such PHOENIX SPIKE SITE ACTIVATIONS PLANNED by the UIR.

TT05-31 The ''TRUMPET'' SUB-SPACE MION FIELD WAVE-FORM has a long TUBELIKE EXTENSION EMERGING from its point of PROJECTION to its TARGET. At the target site, the TRUMPET WAVE-FIELD EXPANDS OUTWARD into an INVERTED CONE, like the “HEAD” of a TRUMPET INSTRUMENT.

TT19-31 The 1943 PHILADEL-PHIA EXPERIMENT and 1983 MONTAUK PROJECT were LAUNCHED on the 20-YEAR August 12 MAGNETIC PEAK. The UIRs’ INTENDED DIMENSIONAL BLEND EXPERIMENT is PLANNED for the 100-YEAR MAGNETIC PEAK of August 12, 2003.